SUPPLY SERVICE PACKAGE · FACADE TURNKEY

Facade Cladding Full System Supply

Natural stone panel + AISI 316 stainless steel mechanical anchor + shop drawing consulting + partner CNC fabrication + Adapazarı final QC + site support + LEED submittal. Sipahi Marble's flagship facade cladding full system package — a consolidated model proven on the Ada Hayat urban regeneration residential facade program. Mechanical fixation over adhesive for seismic safety and long-term durability; principal use in GCC / EU / US markets.

PACKAGE SCOPE

Stone + Mechanical Anchor + Consulting + Site Support

Natural stone facade panel supply

Panels sourced from Turkey's production regions (Bilecik-Söğüt beige, Amasya beige, Muğla-Milas white, Marmara Island white, Elazığ cherry, Diyarbakır Karacadağ basalt) matched to project spec. Vein direction (vein-cut / cross-cut), finish (polished, honed, brushed, leathered) and panel size are coordinated against the shop drawing.

AISI 316 stainless steel mechanical anchor system

Mechanical fixation over adhesive — Sipahi's preferred approach for seismic safety and long-term durability. AISI 316 stainless steel clip, pin, concealed plate and undercut anchor systems are supplied to the structural team's specification. Halfen-style and Fischer-style system options are offered.

Shop drawing + structural consulting input

Sipahi provides draft contributions on panel layout, vein continuity, joint width, anchor position and load distribution for the architectural + structural team. CSI MasterFormat Section 04 43 00 (Natural Stone) compatible detail drafts are shared. Final shop drawing is sealed by the architect / structural engineer.

Partner CNC fabrication + final QC

Cut-to-size panel production is coordinated at Sipahi's partner CNC fabrication workshops. Panel dimensioning, anchor pocket drilling, edge profiling and surface finishing are executed against the shop drawing. Batch-based final QC is performed at the Adapazarı Tekeler supply coordination center, signed off by Sipahi.

Site support + installation coordination

If installation is requested, Sipahi's partner installation crew is engaged — domestic site support + supervising engineer within Türkiye. For GCC / EU / US export projects, a Turkish master crew escort model + local installation partner cooperation is offered. Safety and quality supervision protocols are co-signed.

Certification + LEED submittal package

CE Declaration of Performance (TS EN 1469 facade cladding), TS EN 12058, TS EN 12057 compliance declarations, origin certificate, İMİB member certificate (Registry 336480), typical test reports (ASTM C170, C880, C97 + TS EN 13755, 14157, 12371). LEED MR Credit 5 distance calculation PDF is attached to the submittal.

SIPAHI 6-STEP MODEL

Spec Review → Sample → Shop Drawing → Partner CNC → Shipment → Install

  1. Spec review + project measurement confirmation: Architectural facade plan, panel dimension list, preferred anchor type and delivery address are shared with Sipahi. Within 5-10 business days, a technical suitability report + pricing tier table is issued.
  2. Sample panel + trade sample: 300 x 300 mm or A4 sample panels for selected stone types are couriered. Color, texture, vein and finish final check is performed by the architect team. On approval the pilot batch production starts.
  3. Shop drawing coordination + partner CNC production: Cut-to-size panel production starts at the partner CNC workshop. Panel sizing, drilling, edge profile and surface finishing follow the shop drawing. Sipahi shares weekly production progress photo reports.
  4. Adapazarı final QC + AISI 316 anchor supply: Panels coming off partner fabrication pass a final QC at the Adapazarı Tekeler coordination center. AISI 316 mechanical anchors (clip, pin or concealed plate) are supplied per structural engineer specification.
  5. Packaging + shipment + on-site delivery: Domestic delivery on wooden pallet + shrink wrap + corner protection; export shipment via ISPM-15 stamped wooden crate + sea container. Photo shipment report, origin certificate and CE Declaration of Performance accompany the delivery.
  6. Site support + installation supervision (if contracted): If installation is included in the contract, Sipahi's partner installation crew engages. Safety protocol, supervising engineer visit schedule and weekly progress report are co-signed. On final handover a facade photo album + warranty certificate is transferred.

FLAGSHIP REFERENCE

Ada Hayat — Adapazarı Municipality Urban Regeneration Residential Facade Program

Ada Hayat is a large-scale residential facade program executed under the Adapazarı Municipality urban regeneration initiative. Sipahi Marble consolidated natural stone panel supply, AISI 316 mechanical anchor coordination, panel dimensional standardization, vein continuity and site supervision protocol on this program in joint work with the architect team. That consolidated model underpins today's facade cladding full system package.

Baltürk Hotel, Özel Medar Hospital and Sipahi Business Center are other public flagship references — hotel hospitality facade, healthcare building facade and business center facade application experience. Architects can visit these projects in person via Sakarya-Adapazarı; project photo albums and detail drawings are shared on request.

CERTIFICATION

CE Declaration of Performance + LEED Submittal Package

Facade cladding standardTS EN 1469 Declaration of Performance
Interior floor standardTS EN 12058 Declaration of Performance
Modular slab standardTS EN 12057 Declaration of Performance
Exterior paving standardTS EN 1341 Declaration of Performance
Compressive strength testASTM C170
Flexural strength testASTM C880
Water absorption testTS EN 13755
Abrasion resistance testTS EN 14157
Freeze-thaw testTS EN 12371
LEED MR Credit 5Distance calculation PDF (Turkish production regions within 800 km radius)
LEED EQ Credit 4.1Low-VOC declaration
İMİB member certificateRegistry 336480 — active member 2026

FREQUENTLY ASKED

Facade Cladding Full System — 8 Critical Questions

What exactly does facade cladding full system supply cover?

It is a Model 3 (Turnkey) approach: (1) natural stone panel supply matched to project spec, (2) AISI 316 mechanical anchor system supply, (3) shop drawing + structural consulting input, (4) partner CNC fabrication coordination, (5) Adapazarı final QC, (6) packaging + shipment, (7) installation coordination (if requested) and (8) LEED submittal package. Sipahi delivers a single-contact experience; partner CNC workshops, freight operators and installation crews sit behind Sipahi.

Why do you recommend mechanical anchor over adhesive?

In earthquake-prone Türkiye and in the GCC + EU + US markets, modern facade cladding standard favors mechanical anchoring. Adhesive alone produces cracking, panel drop and uneven weathering issues in long-term use — particularly on 20+ year investment horizon residential, hotel and business center projects. AISI 316 stainless steel mechanical anchor (clip, pin, concealed plate or undercut) is Sipahi's preferred choice for structural safety + long-term durability. The Ada Hayat urban regeneration facade program used this system as well.

Is there a minimum order size?

Domestic projects above 300 m² of facade are economical for the full system package — for smaller scope the panel supply + anchor supply + installation coordination can be quoted as separate packages. For export projects a full container (approx. 300-400 m²) is the economical minimum. Small-scale bespoke projects (boutique hotel, private residence facade) are also handled on a request basis.

At what scale was the Ada Hayat reference?

Ada Hayat is a large-scale residential facade program executed under the Adapazarı Municipality urban regeneration initiative. Sipahi Marble consolidated its natural stone facade panel coordination experience on this program — panel dimensional standardization, vein continuity, AISI 316 mechanical anchor application and site supervision protocols were coordinated jointly with the architect team.

How does installation work on GCC / EU / US export projects?

Two models are offered: (1) Turkish master crew escort — Sipahi organizes the dispatch of a partner installation team from Türkiye, working alongside a local installation partner on site. (2) Coordination + supervision only — the local installation crew is procured by the client, and Sipahi's supervising engineer conducts periodic visits. Site support + weekly progress photo reports are included in Sipahi's standard service package in both models.

What standards do the certificates and test reports meet?

CE Declaration of Performance covers TS EN 1469 (facade cladding), TS EN 12058 (interior floor), TS EN 12057 (modular slab), TS EN 1341 (exterior). Typical test values: ASTM C170 (compressive), ASTM C880 (flexural), ASTM C97 (density), TS EN 13755 (water absorption), TS EN 14157 (abrasion), TS EN 12371 (freeze-thaw). LEED MR Credit 5 production region distance PDF and EQ Credit 4.1 low-VOC declaration are attached to the submittal.

How long does the Adapazarı final QC step take?

Standard 5-10 business days — varies by batch size. Panel dimensional tolerance (±1 mm), surface finish uniformity, vein continuity and anchor pocket drilling position are inspected at the Adapazarı Tekeler coordination center. Panels found defective are returned to the partner workshop or replaced with additional panels. The Sipahi-signed QC report is shared with the client before packaging.

What information should I prepare to receive a quote?

For fastest response: (1) project name and location, (2) total facade area (m²), (3) target stone type (beige, white, travertine, basalt, etc.), (4) panel size range (small 40 x 40 cm or large 120 x 60 cm), (5) preferred finish, (6) anchor type (has the structural engineer specified?), (7) whether installation is included and (8) target delivery date. Based on this brief, pricing tier + production schedule + shop drawing input list are issued within 5-10 business days.

Facade Cladding Full System Quote

Share project name, location, total facade area (m²), target stone type, panel size range, preferred finish, anchor type and target delivery date. Within 5-10 business days, pricing tier + production schedule + shop drawing input list are issued.

Sipahi Mermer ve Granit San. ve Tic. Ltd. Şti. · İMİB Registry 336480 · Adapazarı, Sakarya, Türkiye

Message us on WhatsApp